Specializing in precision AC/DC TIG and structural DC Stick repairs for commercial mower decks, cast aluminum, cast iron, trailer ramp hinges, and broken stud extractions.
Focused exclusively on high-strength in-shop drop-off repairs that keep your equipment running without the cost of new parts.
Rocky Central Texas terrain breaks commercial decks. We stop-drill fatigue cracks, V-groove the seams, and weld 1/8" flat-strap doubler plates to permanently distribute spindle vibration.
Most shops turn away cast aluminum and cast iron. High-frequency AC TIG strips surface oxides to weld pure, crack-free joints on housings, brackets, and rare components.
Ramp hinges and frame corners tear under heavy mower and equipment loads. We cut away fatigued factory barrel hinges and lay deep-penetration DC Stick welds with heavy greaseable hinges.
Snapped an exhaust manifold bolt or sheared a fastener flush in an engine block? Our TIG weld-a-nut extraction technique uses intense thermal shock to back seized studs out cleanly with zero thread damage.
Don't throw away a $300 wrought iron patio set or gate over one broken factory tack weld. We grind out rust, re-align the joint, and lay clean TIG welds that outlast the factory assembly.
When an OEM replacement bracket is discontinued or off-the-shelf parts don't fit, we cut, notch, bevel, and weld custom steel and aluminum brackets to your exact dimensions or template.
Upfront, fair pricing with zero surprises. Quotes are based on metal prep, process, and bench time.
| Repair / Service Description | Welding Process | Typical Turnaround | Pricing Range |
|---|---|---|---|
| Shop Minimum Bench Charge | Any Process | Immediate | $45.00 flat |
| Mower Deck Single Perimeter Crack | DC Stick / DC TIG | 24 Hours | $50 β $75 |
| Spindle Fatigue & Flat Doubler Plate | DC TIG / Stick + 1/8" Plate | 24 Hours | $95 β $135 |
| Severe Spindle Tear-Out Rebuild | DC Stick/TIG + Heavy Graft | 24β48 Hours | $150 β $225 |
| Sheared Bolt / Stud Extraction | TIG Weld-a-Nut | Same Day | $40 β $65 / bolt |
| Cast Aluminum Housing / Bracket | High-Frequency AC TIG | 24 Hours | $75 β $120 |
| Cast Iron Manifold / Mounting Ear | DC TIG Nickel / Bronze | 24β48 Hours | $85 β $130 |
| Patio Chair Leg / Steel Furniture | Precision DC TIG | 24 Hours | $45 β $60 / joint |
| Trailer Ramp Hinge Overhaul (Pair) | Heavy DC Stick | 24β48 Hours | $120 β $180 (pair) |
Front-of-the-line overnight priority queue (drop off by 6:00 PM, ready for pickup by 7:00 AM) so commercial mowing crews never lose a work day.
Welding over oil, grease, or dried grass ruins weld penetration. Avoid this fee completely by wire-brushing, scraping, or pressure-washing the crack area before drop-off.
Applied only if spindles, pulleys, bearings, or seized hardware are left bolted directly over the fracture zone requiring mechanical teardown.
*Shop Minimum Bench Charge is $45.00 flat. Customer supplies specialty hardware (e.g., bullet hinges) or parts are billed at exact pass-through receipt cost.
Fast, frictionless repairs in 4 simple steps.
Take a clear picture of the crack, broken bracket, or part on your phone.
Text the photo to (484) 908-0183. We reply within minutes with a price range and drop-off time.
Bring the unbolted piece to our bench shop in Copperas Cove. We inspect and confirm the total.
Pick up your repaired partβbeveled, reinforced, and ready to bolt back on. Pay via Cash or Venmo.
Send a quick picture right now for a fast, upfront quote. We'll have your part prepped, welded, and ready to work.
All work is currently in-shop drop-off only at our location in Copperas Cove. In-shop drop-off keeps rates significantly lower by eliminating truck roll-out fees and ensures maximum weld quality on our dedicated bench setup.
We are equipped with precision AC/DC TIG and heavy DC Stick. We weld mild carbon steel, cast aluminum, extruded aluminum tubing, stainless steel, and cast iron (via nickel TIG or silicon bronze brazing).
Most small repairs (brackets, stud extractions, single cracks) are completed within 24 hours. For commercial mowing crews, overnight emergency drop-off is available upon request (drop off by 6 PM, ready by 7 AM).
We accept Cash and Venmo upon pickup. Commercial fleet accounts with recurring monthly volume can apply for Net-15 commercial billing.